Booderee National Park Visitor Centre

  • NSW, Australia
  • October 2023
  • Fit Out & Refurbishment
Scope:

Internal and external repair and upgrade works of the Visitor Centre in Booderee National Park (BNP), Jervis Bay.

Internal works included:

  • Demolition and modification works
  • New windows
  • Waterproofing of ground slabs
  • Vinyl flooring
  • Wall & ceiling relining and painting
  • Mechanical & electrical services


External Works included:

  • Demolition & stormwater modification works
  • Shotcrete surface drainage works
  • Roof plumbing and rainwater tank works
  • Fibreglass (Envirowalk) walkway
  • Disabled compliant concrete access ramp
  • External painting

Key Considerations:
  • Significant number of in-ground services (water, sewer, power) clashing with the shotcrete surface drain resulting in rerouting works to avoid the surface drain.
  • NBN existing pit clash with proposed shotcrete surface drain resulting in redesign and alternative solution to redirect the swale
  • Compliance elements in relation to the disabled access ramp
  • Asbestos removal works in accordance with ACT legislation

 

See Related Projects

TAFE NSW Campus Upgrades

NSW, Australia

CIT Yurauna Project

ACT, Australia

Green Patch Refurbishment

NSW, Australia

Contact Us

Want to know more about BY Group? We’d love to hear from you. Contact our team today.

CONTACT US

TOP